Killington Reservoir

30kW, Cumbria
A 30kW medium head scheme retrofitted to existing reservoir infrastructure. This project is being developed in conjunction with the Canal & River Trust and is owned by Community Energy Cumbria
Site: Killington Reservoir
Consenting timeline: June 2011 – Dec 2013
Construction timeline: Spring 2016
Commissioning date: Autumn 2016
Location: Killington, Cumbria
Turbine: Crossflow
Generator: 34kVA 6pole induction
Intake type: Existing draw down pipe
Gross head: 15m
Catchment area: 8.25km2
Max turbine flow: 300lps
Max output: 30kW
Penstock length: ~100m