Glencoyne Beck
100kW, Cumbria
A high head 100kW micro hydro scheme on Glencoyne Beck.
Site overview
| Site: | Glencoyne Beck |
|---|---|
| Construction timeline: | June 2019 – 2020 |
| Commissioning date: | 2019 |
| Location: | Glencoyne Beck |
| Turbine: | Turgo |
| Intake type: | Coanda |
| Gross head: | 170m |
| Catchment area: | 1.6km2 |
| Max turbine flow: | 83lps |
| Max output: | 100kW |