Abbeystead
190kW, Cumbria
A low head 190kW micro hydro scheme on Abbeystead reservoir.
Site overview
| Site: | Abbeystead |
|---|---|
| Construction timeline: | September 2017 – 2019 |
| Commissioning date: | 2019 |
| Location: | Abbeystead |
| Turbine: | Ossberger Crossflow |
| Intake type: | Coanda D-1200 |
| Gross head: | 12m |
| Catchment area: | 49.33 km2 |
| Max turbine flow: | 2000lps |
| Max output: | 190kW |