Combe Gill
230kW, Cumbria
A low head 230kW micro hydro scheme on Combe Gill.
Site overview
| Site: | Combe Gill |
|---|---|
| Construction timeline: | June 2019 – 2020 |
| Commissioning date: | 2019 |
| Location: | Combe Gill |
| Turbine: | Pelton |
| Intake type: | Coanda |
| Gross head: | 180m |
| Catchment area: | 1.5 km2 |
| Max turbine flow: | 173lps |
| Max output: | 230kW |