Hafod y Porth
100kW, Snowdonia
A 100kW high head scheme in the mountains of Snowdonia. Our flagship scheme in North Wales with the National Trust.
| Site: | Hafod y Porth |
|---|---|
| Consenting timeline: | June 2012– Jan 2013 |
| Construction timeline: | 2013-2014 |
| Commissioning date: | September 2014 |
| Location: | Snowdonia, Wales |
| Turbine: | Hydrolite Turgo |
| Generator: | 4 pole synchronous |
| Intake type: | Coanda screen |
| Gross head: | 134m |
| Catchment area: | About 2.32km2 |
| Max turbine flow: | 110lps |
| Max output: | 100kW |
| Penstock length: | 1120m |