Cunsey Beck

45kW, Cumbria
A 45kW scheme reviving hydro at an old mill
Site: Cunsey Beck
Consenting timeline: Sept 2011 – Aug 2012
Construction timeline: Sept 2013 – May 2014
Commissioning date: 19 August 2014
Location: Lake District
Turbine: Crossflow
Generator: Single phase asynchronous generator
Grid: split phase export to single phase proposed
Intake type: Coanda Screen
Gross head: 10m
Catchment area: 21.7km2
Max turbine flow: 800lps
Max output: 45kW
Pipeline length: 180m