100kW, Cumbria
A 100kW high head project on Greenburn, Little Langdale, Cumbria. This scheme is being developed by the National Trust, with Ellergreen providing the consenting works.
| Site: |
Greenburn Beck |
| Consenting timeline: |
Aug 2015– March 2016 |
| Construction timeline: |
2016 – 2018 |
| Commissioning date: |
September 2018 |
| Location: |
Lake District |
| Turbine: |
Turgo |
| Generator: |
Synchronous |
| Intake type: |
Coanda screen |
| Gross head: |
144.5m |
| Catchment area: |
About 2.6km2 |
| Max turbine flow: |
94lps |
| Max output: |
100kW |
| Penstock length: |
1.1km |