Holbeck Ghyll, Windermere
88kW, Cumbria
A 88kW project in the Lake District, near Windermere
| Site: | Holbeck Ghyll, Windermere |
|---|---|
| Design surveys: | July 2011 – ongoing |
| Consenting timeline: | October 2012 – ongoing |
| Location: | Lake District |
| Turbine: | to be confirmed |
| Generator: | Induction generator, 1500rpm |
| Grid: | Three-phase, 100kVA transformer |
| Intake type: | ‘letterbox’, C-1200mm |
| Gross head: | 105m |
| Catchment area: | 1.5km2 |
| Max turbine flow: | 0.12m3/s |
| Max output: | 88kW |
| Pipeline length: | 930 metres |