Kentmere Hall
60kW, Cumbria
A 60kW high head scheme on historic hill farm
| Site: | Kentmere Hall |
|---|---|
| Consenting timeline: | Feb 2011– July 2011 |
| Construction timeline: | August 2011 to December 2011 |
| Commissioning date: | 21/02/2012 |
| Location: | Lake District |
| Turbine: | Gilkes Pelton |
| Generator: | 3 phase asynchronous generator |
| Grid: | 3 Phase, 80KVA Pad mounted transformer |
| Intake type: | Coanda Screen |
| Gross head: | 128m |
| Catchment area: | 4.7km2 |
| Max turbine flow: | 60lps |
| Max output: | 60kW |
| Pipeline length: | 650m |