30kW, Cumbria
A 30kW project in Longsleddale, Cumbria. The second scheme Ellergreen installed in the Longsleddale valley.
| Site: |
Kilnstones, Longsleddale |
| Consenting timeline: |
Jan 2010 – Feb 2010 |
| Construction timeline: |
Feb 2010 – July 2011 |
| Commissioning date: |
August 2011 |
| Location: |
Longsleddale, Lake District |
| Turbine: |
Gilkes Pelton |
| Generator: |
1000 rpm Induction |
| Grid: |
Single Phase, 50 kVA PMT |
| Intake type: |
Coanda Type E – 1000 |
| Gross head: |
111m |
| Catchment area: |
0.76km2 |
| Max turbine flow: |
35lps |
| Max output: |
30kW |
| Pipeline length: |
350m |