Logan Gill
450kW, Cumbria
A 450kW project in the Lake District’s Duddon Valley
| Site: | Logan Gill |
|---|---|
| Design surveys: | September 2008 – January 2009 |
| Consenting timeline: | March 2009 – August 2009 |
| Construction timeline: | August 2009 – July 2010 |
| Commissioning date: | July 2010 |
| Location: | Lake District |
| Turbine: | Gilkes Turgo Impulse |
| Generator: | 1000 rpm Asynchronous |
| Grid: | 526kVA dedicated sub-statio |
| Intake type: | Coanda |
| Gross head: | 96m |
| Catchment area: | 8.4km2 |
| Max turbine flow: | 600lps |
| Max output: | 450kW |
| Pipeline length: | 1050m |