Yew Beck

5kW, Cumbria
A domestic scale 5kW scheme near Rusland, Cumbria. This scheme is being aided by Ellergreen through the design & consenting phase.
Site: Yew Beck
Consenting timeline: May 2012– Dec 2013
Construction timeline: 2014-2015
Commissioning date: October 2015
Location: Rusland, Cumbria
Turbine: Turgo
Generator: tbc
Intake type: Coanda screen
Gross head: 11.24m
Catchment area: About 1.14km2
Max turbine flow: 62lps
Max output: 5kW
Penstock length: 71m