Ystradffin
1.8MW, Mid-Wales
A 1.8MW hydro scheme located on the river Towy in Mid-Wales.
Site overview
| Site: | Ystradffin |
|---|---|
| Construction timeline: | 2018/19 |
| Commissioning date: | 2019 |
| Location: | Mid-Wales |
| Turbine: | Twin Francis |
| Intake type: | Coanda Screen |
| Gross head: | 48m |
| Catchment area: | 89.25km^2 |
| Max turbine flow: | 4200lps |
| Max output: | 1.8MW |





